The doors are opened inside the launch pad 39B payload changeout room (located in the Rotating Service Structure) to reveal the 35,000-pound Port 3/Port 4 space station truss segment.
Source: NASA-KSC (56 sec QuickTime 6 file)
Download this clip to your hardrive.
(Windows users right-click this link. Mac users control-click this link)