| STS-133: Scrub news briefing |
Date: November 5, 2010 Duration: 45 min 55 sec Mission Management Team prelaunch chairman Mike Moses and shuttle launch director Mike Leinbach brief the news media on the ground umbilical carrier plate gaseous hydrogen leak that scrubbed the Nov. 5 countdown. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Gaseous hydrogen leak scrubs shuttle Discovery launch |
Date: November 5, 2010 Duration: 5 min 35 sec The planned Nov. 5 liftoff of space shuttle Discovery was postponed due to a "significant" leak in the gaseous hydrogen venting system between the launch pad and external fuel tank. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Weather postpones launch |
Date: November 4, 2010 Duration: 13 min 15 sec The Mission Management Team decides the weather conditions at Kennedy Space Center were too unfavorable to attempt launching space shuttle Discovery on November 4, postponing the flight 24 hours prior to the start of fueling. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-133: Go for launch |
Date: November 3, 2010 Duration: 15 min 27 sec NASA managers Wednesday cleared the shuttle Discovery for launch Thursday on its 39th and final mission, deciding an electrical glitch that prompted a 24-hour delay was not a threat to flight safety. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Launch delay for electrical issue |
Date: November 2, 2010 Duration: 30 min 23 sec Wednesday's planned launch of space shuttle Discovery is postponed at least 24 hours to give technicians additional time for troubleshooting the electrical problem with the main engine controller circuitry. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Tuesday status briefing |
Date: November 2, 2010 Duration: 26 min 54 sec With the countdown clocks now ticking, a progress report on activities for space shuttle Discovery, an overview its mission payloads and the latest weather outlook is given during this status briefing is held at 10:30 a.m. EDT on Tuesday, Nov. 2. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Pre-launch news conference |
Date: November 1, 2010 Duration: 29 min 51 sec This is the pre-launch news conference for space shuttle Discovery's STS-133 mission to the International Space Station with the Mission Management Team chairman, the launch director and the shuttle weather officer. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Countdown preview |
Date: October 31, 2010 Duration: 16 min 27 sec NASA test director Steve Payne and weather officer Kathy Winters provide an update on shuttle Discovery's launch preparations and preview the start of the three-day countdown sequence during this briefing held at 10 a.m. EDT on Oct. 31. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Another launch delay |
Date: October 30, 2010 Duration: 21 min 9 sec NASA test director Jeff Spaulding reports on the space shuttle Discovery helium leak repair and the extra time required to complete the work, which has delayed launch an additional day to Wednesday, Nov. 3. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Launch delayed 24 hours |
Date: October 29, 2010 Duration: 24 min 1 sec Jeff Spaulding, NASA test director, explains why space shuttle Discovery's launch has been postponed until November 2 and launch weather officer Kathy Winter previews the forecast. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Crew arrives for launch |
Date: October 28, 2010 Duration: 6 min 7 sec The six astronauts arrive at the Kennedy Space Center launch site in sleek T-38 jets, trained and ready to take shuttle Discovery for its final spaceflight. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: FRR news conference |
Date: October 25, 2010 Duration: 46 min 51 sec NASA officials announce the launch date for space shuttle Discovery's STS-133 mission to the International Space Station during this briefing at Kennedy Space Center following the Flight Readiness Review. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133 pre-flight briefings: Programs |
Date: October 21, 2010 Duration: 70 min 36 sec Space shuttle program manager John Shannon and space station ops and integration manager Dan Hartman open the day of pre-flight news conferences previewing Discovery's STS-133 mission with this program perspectives briefing. They discuss various hot topics for both programs. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133 pre-flight briefings: Mission |
Date: October 21, 2010 Duration: 73 min 50 sec A detailed preview of space shuttle Discovery's STS-133 mission that will deliver the Permanent Multipurpose Module to the International Space Station is provided in this briefing with lead shuttle flight director Bryan Lunney and lead station flight director Royce Renfrew. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133 pre-flight briefings: EVAs |
Date: October 21, 2010 Duration: 24 min 20 sec Two spacewalks are planned during space shuttle Discovery's STS-133 mission to the International Space Station. Art Thomason, the lead spacewalk officer, previews the EVAs in this briefing. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133 pre-flight briefings: Robonaut |
Date: October 21, 2010 Duration: 46 min 59 sec Take an in-depth look at the history and promise of Robonaut 2, the first humanoid robot to be launched into space. The shuttle Discovery will deliver "R2" to its new home aboard the International Space Station. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133 pre-flight briefings: The Discovery astronauts meet the press |
Date: October 21, 2010 Duration: 49 min 43 sec Commander Steve Lindsey, pilot Eric Boe and mission specialists Al Drew, Tim Kopra, Mike Barratt and Nicole Stott hold the traditional pre-flight news conference from Johnson Space Center. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Payload bay doors closed |
Date: October 16, 2010 Duration: 5 min 1 sec With the Permanent Multipurpose Module and cargo pallet loaded aboard for the space station, Discovery's the 60-foot-long payload bay doors are closed for launch. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Departure back to Houston |
Date: October 15, 2010 Duration: 2 min 53 sec After wrapping up the Terminal Countdown Demonstration Test, the crew boards T-38 jets for the flight back to their homebase at the Johnson Space Center in Houston. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Crew inspects payload bay |
Date: October 15, 2010 Duration: 1 min 41 sec Now at the Kennedy Space Center for the launch countdown, the astronauts go to launch pad 39A for a close-up look and sharp-edge inspection of the payloads loaded into Discovery's cargo bay. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
Pages: << Prev | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | Next >> |