| STS-133: Crew egresses the space shuttle after countdown rehearsal |
Date: October 15, 2010 Duration: 4 min 19 sec As seen live, the Discovery astronauts practice exiting the space shuttle and using the buddy system to leave the vehicle in groups of pairs following the simulated main engine cutoff during countdown test. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Shuttle evacuation practice |
Date: October 15, 2010 Duration: 2 min 18 sec After clocks halted in the final seconds to simulate a shutdown of the three main engines just prior to liftoff, the crew exits the shuttle and practices scurrying to the slide-wire baskets for a quick evacuation of the pad. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Crew boards Discovery |
Date: October 15, 2010 Duration: 11 min 30 sec After the short ride out to launch pad 39A, the astronauts walk across the access arm to the White Room and begin boarding shuttle Discovery for the final three hours of the practice countdown. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Florida sunrise at pad 39A |
Date: October 15, 2010 Duration: 5 min 42 sec The sun rises over Kennedy Space Center's launch pad 39A where space shuttle Discovery stands ready for the morning's countdown dress rehearsal with the astronauts and launch team. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Launch day simulation begins |
Date: October 15, 2010 Duration: 8 min 19 sec The astronauts follow a normal launch morning routine during the Terminal Countdown Demonstration Test, donning their bright orange spacesuits and departing the crew quarters building to get into the Astrovan. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133 crew interviews: Steve Lindsey |
Date: October 14, 2010 Duration: 47 min 27 sec This pre-flight interview talks with NASA astronaut Steve Lindsey, commander of space shuttle Discovery's STS-133 mission to the International Space Station. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-133 crew interviews: Eric Boe |
Date: October 14, 2010 Duration: 28 min 1 sec This pre-flight interview talks with NASA astronaut Eric Boe, pilot of space shuttle Discovery's STS-133 mission to the International Space Station. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-133 crew interviews: Al Drew |
Date: October 14, 2010 Duration: 47 min 7 sec This pre-flight interview talks with NASA astronaut Al Drew, mission specialist No. 1 of space shuttle Discovery's STS-133 mission to the International Space Station. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-133 crew interviews: Tim Kopra |
Date: October 14, 2010 Duration: 35 min 16 sec This pre-flight interview talks with NASA astronaut Tim Kopra, mission specialist No. 2 of space shuttle Discovery's STS-133 mission to the International Space Station. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-133 crew interviews: Mike Barratt |
Date: October 14, 2010 Duration: 32 min 16 sec This pre-flight interview talks with NASA astronaut Mike Barratt, mission specialist No. 3 of space shuttle Discovery's STS-133 mission to the International Space Station. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-133 crew interviews: Nicole Stott |
Date: October 14, 2010 Duration: 29 min 40 sec This pre-flight interview talks with NASA astronaut Nicole Stott, mission specialist No. 4 of space shuttle Discovery's STS-133 mission to the International Space Station. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-133: Commemorative signing |
Date: October 14, 2010 Duration: 1 min 10 sec The Discovery astronauts add their names to the commemorative wall signing inside the Vehicle Assembly Building that pays tribute to the space shuttle program. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Emergency training at launch pad tower and bunker |
Date: October 14, 2010 Duration: 5 min 45 sec The astronauts spend time learning how to evacuate pad 39A if an emergency arises, including procedures to operate the slide-wire baskets that would quickly whisk the crew from the launch tower to a bunker west of the pad. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Landing simulations |
Date: October 13, 2010 Duration: 9 min 15 sec This remarkable footage was shot aboard the Shuttle Training Aircraft as space shuttle Discovery commander Steve Lindsey makes practice landing approaches into Kennedy Space Center's runway. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Tank test driving |
Date: October 13, 2010 Duration: 3 min 23 sec Discovery's astronauts take turns test-driving an armored tank available for the crew to escape the pad 39A area if an emergency arises during the launch countdown. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Payloads installed in orbiter |
Date: October 11, 2010 Duration: 1 min 53 sec Space shuttle Discovery's cargo bay is filled with the orbiter's final payload complement, a new module and platform that are among the last accouterments for the International Space Station after a decade of construction. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Payload arrives at launch pad |
Date: October 7, 2010 Duration: 9 min 39 sec The transportation canister holding space shuttle Discovery's payloads for the STS-133 space station mission is driven to launch pad 39A and lifted into service gantry. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Canister goes upright |
Date: October 6, 2010 Duration: 5 min 43 sec The transportation canister hauling the PMM and ELC 4 payloads is taken to the rotating building at Kennedy Space Center and turned vertically for delivery to the launch pad. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Hoisting PMM into transporter |
Date: October 4, 2010 Duration: 5 min 12 sec The Permanent Multipurpose Module is placed into the payload transportation canister at the Space Station Processing Facility for the trip to launch pad 39A and installation into Discovery. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-133: Weighing new module |
Date: October 4, 2010 Duration: 8 min 49 sec The Italian-made module that will give the International Space Station a float-in closet and help ease the outpost's storage woes is maneuvering into a special workstand for pre-launch weighing.
|  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
Pages: << Prev | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | Next >> |