| STS-132 Launch Replays: Playalinda Beach |
Date: May 17, 2010 Duration: 3 min 11 sec This tracking camera north of launch pad 39A along Playalinda Beach offers a close-up view of the three main engines and solid rocket boosters during Atlantis' climb out. (Replay includes live launch audio). |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-132 Launch Replays: Camera 070 |
Date: May 17, 2010 Duration: 23 sec Launch pad engineering camera 070 is zoomed in on space shuttle Atlantis' three main engines to give this close-up view during ignition. (Replay includes live launch audio). |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-132 Launch Replays: Camera 071 |
Date: May 17, 2010 Duration: 44 sec Launch pad engineering camera 071 provides a front view of space shuttle Atlantis during ignition of the main engines and the billowing plume of stream in the last seconds of the countdown. (Replay includes live launch audio). |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-132 Flight Day 4: Status briefing |
Date: May 17, 2010 Duration: 44 min 8 sec The space station flight director, lead spacewalk officer and Mission Management Team chairman hold the Flight Day 4 status briefing following the first EVA of STS-132. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-132 Flight Day 4: Dextre addition |
Date: May 17, 2010 Duration: 7 min 52 sec Garrett Reisman turns attention to Canada's Dextre and attaching the Enhanced ORU Temporary Platform. This small deck at the base of the robot will hold equipment. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-132 Flight Day 4: Torquing antenna |
Date: May 17, 2010 Duration: 18 min 33 sec The spacewalkers torque down the space-to-ground antenna, which uses Ku-band communications for high-speed transmissions between the International Space Station and Earth via NASA's Tracking and Data Relay Satellites. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-132 Flight Day 4: Getting the dish |
Date: May 17, 2010 Duration: 21 min 11 sec Using his cordless power tool, Garrett Reisman loosens bolts holding the Ku-band antenna dish onto the launch structure. Clearance is tight and it's a delicate moment to free the antenna while the arm begins moves away from the carrier. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-132 Flight Day 4: Bolting boom |
Date: May 17, 2010 Duration: 10 min 50 sec The boom is bolted in place for the new space-to-ground antenna package. This is the structural pole to support the communications dish, plus route the power and data umbilicals from the station. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-132 Flight Day 4: Boom handoff |
Date: May 17, 2010 Duration: 10 min 30 sec The new Ku-band antenna boom is released from the launch pallet by Steve Bowen and then handed to Garrett Reisman to hold as the space station's robot arm swings the spacewalker up to the Z1 truss worksite. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-132 Flight Day 4: Unstowing boom |
Date: May 17, 2010 Duration: 10 min 42 sec To give the International Space Station a new communications antenna, some assembly is required. It was built in two pieces -- the support boom and the dish. The spacewalkers release bolts to unpack the boom from the launch carrier. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-132 Flight Day 4: EVA No. 1 starts |
Date: May 17, 2010 Duration: 7 min 41 sec Shuttle Atlantis astronauts Garrett Reisman and Steve Bowen open the hatchway and float outside the International Space Station to begin the mission's first spacewalk. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-132 Flight Day 4: Update with space station flight director |
Date: May 17, 2010 Duration: 6 min 34 sec International Space Station flight director Scott Stover gives an update on activities aboard the combined shuttle-station complex and looks ahead to the plans for Flight Day 4 during this interview before crew wakeup. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-132 Flight Day 4: EVA No. 1 preview |
Date: May 17, 2010 Duration: 9 min 21 sec Lisa Shore, the lead spacewalk officer for Atlantis' STS-132 flight, provides this detailed step-by-step preview of EVA No. 1 by astronauts Garrett Reisman and Steve Bowen. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-132 Flight Day 4: The day's agenda |
Date: May 17, 2010 Duration: 1 min 20 sec Emily Nelson, lead space station flight director for the STS-132 mission, previews the Flight Day 4 activities that will feature the first spacewalk for the Atlantis flight. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-132 Flight Day 3: The highlights |
Date: May 17, 2010 Duration: 26 min 4 sec All of the video highlights from space shuttle Atlantis' rendezvous and docking with the International Space Station to begin its visit are packaged into this movie. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-132 Flight Day 3: Pallet anchored on ISS |
Date: May 16, 2010 Duration: 8 min 18 sec The Integrated Cargo Carrier - Vertical Light Deployable, or ICC-VLD, is installed onto the space station's mobile railcar for the subsequent day's spacewalk to unload the communications antenna and Dextre device from the pallet. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-132 Flight Day 3: MMT update |
Date: May 16, 2010 Duration: 27 min 14 sec Mission Management Team chairman LeRoy Cain provides this update on the progress of space shuttle Atlantis' flight to the International Space Station on May 16 at 4 p.m. EDT. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-132 Flight Day 3: Equipment carrier unberthed from shuttle's payload bay |
Date: May 16, 2010 Duration: 11 min 12 sec A small pallet stacked with new parts and batteries for the International Space Station is lifted out of shuttle Atlantis' payload bay by the robotic arm. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-132 Flight Day 3: Status briefing |
Date: May 16, 2010 Duration: 32 min 22 sec The post-docking Mission Status Briefing for space shuttle Atlantis' STS-132 mission was held at 2 p.m. EDT during Flight Day 3 with lead shuttle flight director Mike Sarafin from the Johnson Space Center. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-132 Flight Day 3: Welcome aboard |
Date: May 16, 2010 Duration: 4 min 50 sec The six space shuttle Atlantis astronauts are being welcomed aboard the International Space Station by the six-person Expedition 23 resident crew. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
Pages: << Prev | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | Next >> |