| STS-127 launch replays: Camera 070 |
Date: July 16, 2009 Duration: 22 sec Launch pad engineering camera 070 is zoomed in on space shuttle Endeavour's three main engines to give this close-up view during ignition. (Replay includes live launch audio). |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (480x270) |  | |
 |
| STS-127 launch replays: Camera 071 |
Date: July 16, 2009 Duration: 21 sec Launch pad engineering camera 071 provides a front view of space shuttle Endeavour during ignition of the main engines and the billowing plume of stream in the last seconds of the countdown. (Replay includes live launch audio). |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (480x270) |  | |
 |
| STS-127 launch replays: Front camera |
Date: July 16, 2009 Duration: 2 min 56 sec Beautiful footage of space shuttle Endeavour's climb away into the sky is captured from this camera positioned in front of launch pad 39A. (Replay includes live launch audio). |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (480x360) |  | |
 |
| STS-127 launch replays: Beach tracker |
Date: July 16, 2009 Duration: 2 min 29 sec A tracking camera at positioned on a mound along beach southeast of launch pad 39A provides this angle of space shuttle Endeavour's liftoff. (Replay includes live launch audio). |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (480x270) |  | |
 |
| STS-127 launch replays: UCS-23 tracker |
Date: July 16, 2009 Duration: 1 min 56 sec This widescreen video of space shuttle Endeavour's launch on STS-127 was captured by the UCS-23 tracking camera positioned southeast of the pad. (Replay includes live launch audio). |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (480x270) |  | |
 |
| STS-127 launch replays: VAB roof |
Date: July 16, 2009 Duration: 1 min 38 sec From atop the 52-story Vehicle Assembly Building located three-and-a-half miles away, this launch video was recorded by a public affairs camera. (Replay includes live launch audio). |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (480x270) |  | |
 |
| STS-127 launch replays: Pad perimeter |
Date: July 16, 2009 Duration: 40 sec The launch pad 39A perimeter camera gives this side view of space shuttle Endeavour igniting its engines and roaring skyward for STS-127. (Replay includes live launch audio). |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (480x270) |  | |
 |
| STS-127 launch replays: Press Site |
Date: July 16, 2009 Duration: 1 min 4 sec This is the view from Kennedy Space Center's Press Site at Complex 39 as space shuttle Endeavour launches at 6:03 p.m. on the STS-127 space station construction mission. (Replay includes live launch audio). |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (480x270) |  | |
 |
| STS-127 launch replays: Patrick AFB |
Date: July 16, 2009 Duration: 1 min 8 sec A powerful tracking camera located at Patrick Air Force Base gives this widescreen video of space shuttle Endeavour launching on the northeast trajectory from the Cape. (Replay includes live launch audio). |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (480x270) |  | |
 |
| STS-127: Jettisoned fuel tank |
Date: July 16, 2009 Duration: 7 min 46 sec This handheld camcorder footage shot by one of the shuttle Endeavour astronauts moments after arriving in space shows the discarded external fuel tank falling away from the orbiter. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (480x360) |  | |
 |
| STS-127: Liftoff of Endeavour |
Date: July 16, 2009 Duration: 10 min 40 sec Space shuttle Endeavour rockets away from Kennedy Space Center at 6:03 p.m. EDT on its mission to finish constructing the Japanese Kibo science facilities at the International Space Station.
|  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (480x360) |  | |
 |
| STS-127: AstroVan takes crew to pad |
Date: July 15, 2009 Duration: 8 min 22 sec The space shuttle Endeavour astronauts travel to launch pad 39A aboard the AstroVan. Once at the seaside complex, they take a few moment to look up at the shuttle before riding the elevator up the launch tower. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (480x270) |  | |
 |
| STS-127: Astronauts leave crew quarters |
Date: July 15, 2009 Duration: 4 min 40 sec Commander Mark Polansky, pilot Doug Hurley, flight engineer Julie Payette, spacewalkers Chris Cassidy, Tom Marshburn and Dave Wolf, and station-bound astronaut Tim Kopra depart the Kennedy Space Center crew quarters to board the AstroVan for the ride from the Industrial Area to launch pad 39A on the edge of the Atlantic Ocean. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (480x270) |  | |
 |
| STS-127: Crew suits up for launch |
Date: July 15, 2009 Duration: 2 min 37 sec The seven STS-127 astronauts finish donning and complete pressure checks of their the day-glow orange ascent and entry partial pressure spacesuits in crew quarters on launch day. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (480x270) |  | |
 |
| STS-127: Weather scrubs launch again |
Date: July 13, 2009 Duration: 4 min 48 sec For the second straight day, launch of space shuttle Endeavour was postponed July 13 due to summertime thunderstorms around the Kennedy Space Center. It was the fifth scrub for the space station construction mission. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (480x270) |  | |
 |
| STS-127: Crew arrives at pad on July 13 |
Date: July 13, 2009 Duration: 8 min 48 sec The AstroVan drives by Kennedy Space Center's Vehicle Assembly Building and then arrives at pad 39A during July 13 launch attempt. The astronauts gaze up at the shuttle after getting to pad. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (480x270) |  | |
 |
| STS-127: Crew quarters depart on July 13 |
Date: July 13, 2009 Duration: 2 min 47 sec In preparation for the July 13 launch attempt, the space shuttle Endeavour astronauts depart crew quarters and board the AstroVan for the ride to pad 39A. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (480x270) |  | |
 |
| STS-127: Suiting up for July 13 countdown |
Date: July 13, 2009 Duration: 2 min 36 sec The space shuttle Endeavour astronauts finish getting ready in the suit room of the crew quarters building in preparation for the July 13 launch attempt. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (480x270) |  | |
 |
| STS-127: Thunderstorms scrub launch |
Date: July 12, 2009 Duration: 3 min 11 sec Thunderstorms west of the launch site prevent space shuttle Endeavour from blasting off July 12 during its brief launch window to rendezvous with the International Space Station. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (480x270) |  | |
 |
| STS-127: Endeavour pre-launch campaign |
Date: July 12, 2009 Duration: 8 min 21 sec This narrated footage shows the highlights from preparations that space shuttle Endeavour underwent at Kennedy Space Center for mission STS-126 to the space station. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (480x270) |  | |
 |
Pages: << Prev | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | Next >> |