| Expedition 24: Unplug power lines |
Date: August 11, 2010 Duration: 9 min 46 sec Spacewalker Tracy Caldwell Dyson finishes detaching electrical and data cables from the Starboard 1 truss' cooling system pump module at the International Space Station. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| Expedition 24: Final fluid connector demated from failed coolant pump |
Date: August 11, 2010 Duration: 8 min 18 sec Using brute strength, spacewalker Doug Wheelock frees the final ammonia umbilical from the International Space Station's failed pump module for replacement. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| Expedition 24: No leaks from difficult connector on the second spacewalk |
Date: August 11, 2010 Duration: 12 min 5 sec Spacewalker Doug Wheelock returns to the troublesome ammonia hose at the Starboard 1 coolant pump on the second spacewalk, successfully closing the connector and experiencing no leakage. The umbilical's leak halted the crew's first spacewalk a few days earlier. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| Expedition 24: Post-EVA briefing |
Date: August 7, 2010 Duration: 37 min 22 sec Mike Suffredini, International Space Station program manager, Courtenay McMillan, Expedition 24 flight director, and David Beaver, the spacewalk officer, hold this Mission Status Briefing from Houston following the first EVA.
|  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| Expedition 24: Problem connector finally freed but then leaks |
Date: August 7, 2010 Duration: 12 min 17 sec After a couple hours of work, Doug Wheelock finally gets the troublesome ammonia umbilical freed from the failed pump module on the Starboard 1 truss. But leaking coolant stops him from completely removing the hose. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| Expedition 24: Left-hand ammonia connector comes off with ease |
Date: August 7, 2010 Duration: 5 min 5 sec The second of three 1.5-inch ammonia umbilicals has been disconnected from the old pump module by spacewalker Doug Wheelock. The M1 connector, positioned on the left-side of Doug's workspace, was released with relative ease.
|  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| Expedition 24: Skipping to next line |
Date: August 7, 2010 Duration: 15 min 32 sec Doug Wheelock skips over the troublesome connector and successfully removes the next ammonia line. He then routes the umbilical into a vent box designed to keep the cooling system stable during the pump replacement. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| Expedition 24: Troubles and advice for stuck ammonia line |
Date: August 7, 2010 Duration: 15 min 17 sec Spacewalker Doug Wheelock runs into troubles getting the first of three 1.5-inch ammonia umbilicals released from the pump. Astronaut Dave Wolf, who installed on this truss in 2002, radios advice from Mission Control.
|  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| Expedition 24: Unplugging the pump |
Date: August 7, 2010 Duration: 3 min 43 sec The spacewalkers remove a half-inch-diameter cooling line from the failed ammonia pump module, detaching this first umbilical to the device from the International Space Station. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| Expedition 24: EVA gets underway |
Date: August 7, 2010 Duration: 7 min 20 sec Spacewalker Doug Wheelock begins tackling initial preparations for removing the failed ammonia pump module on the Starboard 1 truss, including a visual survey of the device and removing hose clamps. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| Expedition 24: Pump replacement ordered |
Date: August 2, 2010 Duration: 54 min 41 sec Mike Suffredini, International Space Station program manager, and Courtenay McMillan, Expedition 24 spacewalk flight director, discuss the pump module failure and plans for two EVAs needed to replace the device. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| Expedition 24: EVA narration |
Date: July 26, 2010 Duration: 4 min 31 sec A step-by-step preview of the Russian spacewalk to replace a bad television camera and wire up the outpost's new Rassvet module is provided in this narrated animation by Chris Edelen, Expedition 24 lead spacewalk flight director. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| Expedition 24: Russian EVA preview |
Date: July 21, 2010 Duration: 29 min 36 sec Chris Edelen, Expedition 24 lead spacewalk flight director, and Kirk Shireman, International Space Station deputy program manager, preview the planned July 27 EVA by cosmonauts Fyodor Yurchikhin and Mikhail Kornienko. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| Expedition 24: Full Progress broadcast |
Date: July 4, 2010 Duration: 70 min 10 sec If you missed the Progress 38P cargo ship's docking to the International Space Station, you can watch NASA's entire live broadcast right here. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| Expedition 24: Progress 38P docks |
Date: July 4, 2010 Duration: 9 min 19 sec A Russian cargo freighter flying on autopilot performs a successful rendezvous and docking with the space station, delivering two-and-a-half tons of supplies and equipment for the international outpost and its resident crew. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| Expedition 24: Media interviews |
Date: July 2, 2010 Duration: 21 min 56 sec The American members of the International Space Station's Expedition 24 crew participate in live media interviews with the Orange County Register and Al Jazeera Television. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| Expedition 24: Resupply ship launched |
Date: June 30, 2010 Duration: 5 min 31 sec A load of basic essentials for the International Space Station and its resident crew -- food, fuel and supplies -- launches aboard the Russian-made Progress 38P cargo freighter from the Baikonur Cosmodrome. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| Expedition 24: Soyuz TMA-19 moved from Zvezda to Rassvet module |
Date: June 28, 2010 Duration: 26 min 46 sec The International Space Station's new docking module added by the shuttle Atlantis astronauts in May receives its first vehicle when the outpost's crew relocates the Soyuz TMA-19 capsule there. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| Expedition 24: Welcome aboard |
Date: June 17, 2010 Duration: 15 min 57 sec The hatchway between the Soyuz spacecraft and International Space Station is opened, allowing the newest residents to float into the complex for a welcoming ceremony.
|  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| Expedition 24: Moscow briefing |
Date: June 17, 2010 Duration: 9 min 55 sec Russian space program officials and NASA's spaceflight chief hold a Soyuz post-docking news conference from the mission control center outside Moscow. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
Pages: << Prev | 1 | 2 | 3 | Next >> |