| STS-134: Astronauts return for launch |
Date: May 12, 2011 Duration: 13 min 49 sec Back at the Kennedy Space Center for the second countdown, the shuttle Endeavour astronauts arrive at the Florida spaceport after spending the recent launch delay undergoing refresher training in Houston.
|  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-134: Endeavour targets May 16 for launch |
Date: May 9, 2011 Duration: 53 min 1 sec Chairman of the pre-launch Mission Management Team and the shuttle launch director provide a comprehensive update on Endeavour's repairs and announce the new target liftoff date for STS-134. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x480) |  | |
 |
| STS-134: Checking Endeavour's wiring |
Date: May 6, 2011 Duration: 2 min 10 sec Technicians work just inside the right-hand doorway of space shuttle Endeavour's aft engine compartment to check electrical wiring as part of the heater troubleshooting efforts. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-134: Forensics begin on old ALCA 2 |
Date: May 4, 2011 Duration: 1 min 40 sec The Aft Load Control Assembly power switching box that was removed from space shuttle Endeavour is taken the laboratory where technicians open the device to begin the failure analysis and determine what went wrong. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-134: ALCA 2 removed from shuttle |
Date: May 3, 2011 Duration: 5 min 3 sec Endeavour's old Aft Load Control Assembly No. 2 electronics box (ALCA 2) was removed from the space shuttle last night by technicians working in the cramped quarters of the aft compartment. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-134: Switchbox troubleshooting |
Date: May 2, 2011 Duration: 5 min 47 sec Technicians work inside the shuttle Endeavour's aft compartment to troubleshoot the Load Control Assembly No. 2 electrical problem while other workers ready a replacement unit for installation. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-134: Launch delayed further |
Date: May 1, 2011 Duration: 36 min 43 sec Pre-launch Mission Management Team chairman Mike Moses and shuttle launch director Mike Leinbach provide an update on the electrical troubles with the Aft Load Control Assembly and the further delay for Endeavour. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| First Family departs after visit |
Date: April 29, 2011 Duration: 9 min 58 sec The First Family departs Cape Canaveral after the visit to Kennedy Space Center. They had planned to watch shuttle Endeavour's launch but a technical problem had scrubbed the liftoff. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| First Family tours space center |
Date: April 29, 2011 Duration: 3 min 41 sec President Obama and the First Family tour the Orbiter Processing Facility bay where shuttle Atlantis is being readied for the program's final mission, plus meet with Endeavour's astronauts in the Launch Control Center. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| First Family arrives at the Cape |
Date: April 29, 2011 Duration: 13 min 1 sec President Obama arrives at the Cape Canaveral Air Force Station's Skid Strip to tour the Kennedy Space Center with his family on the day originally planned for shuttle Endeavour's launch. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-134: Post-scrub briefing |
Date: April 29, 2011 Duration: 38 min 21 sec This news conference was held from the Kennedy Space Center about five hours after the space shuttle Endeavour launch was scrubbed by a technical problem. Officials talk to reporters about the heater issue and also President Obama's visit earlier in the day. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-134: Launch director interview |
Date: April 29, 2011 Duration: 5 min 18 sec Space shuttle launch director Mike Leinbach explains the Auxiliary Power Unit No. 1 heater problem and the decision to scrub Endeavour's countdown to fix the glitch. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-134: Launch attempt scrubbed |
Date: April 29, 2011 Duration: 5 min 5 sec Launch of the space shuttle Endeavour is scrubbed three-and-a-half hours before the scheduled blastoff time because of an electrical glitch the knocked out fuel line heaters on Auxiliary Power Unit No. 1. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-134: Crew departs quarters on April 29 |
Date: April 29, 2011 Duration: 3 min 37 sec In preparation for the April 29 launch attempt, the space shuttle Endeavour astronauts depart crew quarters and board the AstroVan for the ride to pad 39A.
|  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-134: Suiting up for April 29 countdown |
Date: April 29, 2011 Duration: 2 min 53 sec The space shuttle Endeavour astronauts finish getting ready in the suit room of the crew quarters building in preparation for the April 29 launch attempt. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-134: Endeavour's pre-launch campaign |
Date: April 29, 2011 Duration: 15 min 28 sec This narrated footage shows the preparations that shuttle Endeavour underwent at Kennedy Space Center for launch to the STS-134 mission. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-134: Preparing Endeavour's fuel tank |
Date: April 29, 2011 Duration: 11 min 4 sec This narrated footage shows the preparations that the STS-134 mission payloads underwent at Kennedy Space Center for launch to the International Space Station aboard Endeavour. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-134: Preparing Endeavour's fuel tank |
Date: April 29, 2011 Duration: 12 min 26 sec Learn about the process the space shuttle external fuel tanks undergo at NASA's Kennedy Space Center to ready them for launch, including the interesting history for the one flying on Endeavour's STS-134 mission. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-134: Tower rollback time-lapse |
Date: April 29, 2011 Duration: 58 sec This time-lapse video shows space shuttle Endeavour being uncovered from the cocoon-like rotating service gantry for liftoff from Kennedy Space Center's launch pad 39A. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
| STS-134: Thursday status briefing |
Date: April 28, 2011 Duration: 42 min 1 sec A progress report on activities for space shuttle Endeavour, an overview its mission payloads and the latest weather outlook is given during this status briefing is held at 10 a.m. EDT on Thursday, April 28. |  |
| PLAY | | DOWNLOAD |  | MPEG-4 (H.264) (640x360) |  | |
 |
Pages: << Prev | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | Next >> |